Path 1: Community Signaling
Parameters
- Name: signaling
- Maximum Deciding: 10 referenda concurrently
- Decision Deposit: 100 QUAN
- Prepare Period: 6 hours
- Decision Period: 3 days
- Confirm Period: 6 hours
- Minimum Enactment Period: 6 hours
Approval and Support Thresholds
Minimum Approval
- Linear decreasing curve from 60% to 50%
- Requires 60% approval at the beginning of the voting period
- Requires at least 50% approval at the end
Minimum Support
- Linear decreasing curve from 10% to 1%
- Requires at least 10% of the total possible votes at the beginning
- Minimum 1% of the total possible votes required by the end of the voting period
Permissions
- Any account can submit and vote on proposals in this track
- Used for non-binding community sentiment gathering
- Ideal for feature requests, community feedback, and general signaling